Skip to main content

New Builds, Remodels, & Additions: Call Us for a Home Transformation!

Request Consultation

What to Expect During a Bathroom Remodel: A Step-by-Step Guide

January 17, 2025
What to Expect During a Bathroom Remodel: A Step-by-Step Guide

A bathroom remodel is an excellent way to update your home, enhance functionality, and increase property value. However, the process involves several stages, each with its own set of tasks and considerations. Knowing what to expect can help you prepare and ensure a smooth remodeling experience.


Here’s a detailed guide to what happens during a bathroom remodel and how to navigate each phase.

1. Planning and Design Phase

What Happens:

  • Meet with a designer or contractor to discuss your goals, budget, and style preferences.
  • Finalize the layout, select materials, and decide on fixtures like sinks, vanities, and shower systems.
  • Obtain necessary permits for plumbing, electrical, and structural changes.

Tips:

  • Clearly communicate your must-haves and priorities.
  • Allow time for revisions to perfect the design.

2. Preparing for Construction

What Happens:

  • Clear the bathroom of personal items and set up a temporary solution if needed (e.g., access to another bathroom).
  • Protect surrounding areas with dust barriers and coverings.

Tips:

  • Discuss the timeline and daily access requirements with your contractor.
  • Plan for limited bathroom use during construction.

3. Demolition

What Happens:

  • Remove old fixtures, tiles, and cabinetry.
  • Address any underlying issues, such as mold, water damage, or outdated plumbing.

Tips:

  • Expect noise and debris; consider spending time away from home during this phase.
  • Be prepared for surprises that might require adjustments to the scope or budget.

4. Plumbing and Electrical Work

What Happens:

  • Install or update plumbing for new fixtures and layouts.
  • Add or move outlets, lighting, and ventilation systems.
  • Schedule inspections to ensure compliance with local codes.

Tips:

  • Double-check the placement of fixtures, outlets, and switches before installation.
  • Consider energy-efficient and water-saving upgrades.

5. Installing Walls and Flooring

What Happens:

  • Install moisture-resistant drywall and backer boards.
  • Lay flooring materials, ensuring proper waterproofing and leveling.

Tips:

  • Choose durable, slip-resistant materials for safety and longevity.
  • Coordinate flooring with wall colors and overall design.

6. Adding Fixtures and Features

What Happens:

  • Install sinks, vanities, toilets, and shower or tub systems.
  • Add faucets, mirrors, lighting, and storage solutions.

Tips:

  • Test all fixtures for functionality and leaks.
  • Ensure that features like vanities and cabinets are level and securely installed.

7. Painting and Finishing Touches

What Happens:

  • Paint walls and ceilings with moisture-resistant paint.
  • Add decorative elements like hardware, towel racks, and shelving.
  • Perform a thorough cleaning of the space.

Tips:

  • Choose neutral colors for resale value or bold accents to showcase your style.
  • Walk through the space with your contractor to create a punch list of final adjustments.

8. Final Inspection and Walkthrough

What Happens:

  • Conduct a final inspection to ensure everything meets your expectations.
  • Address any outstanding issues or touch-ups with your contractor.

Tips:

  • Test all systems, including plumbing and electrical, to confirm proper operation.
  • Keep warranties and maintenance instructions for future reference.

Common Challenges and How to Handle Them

1. Delays:

  • Weather, material shortages, or scheduling conflicts can cause delays. Stay flexible and maintain communication with your contractor.

2. Budget Overruns:

  • Include a 10-15% contingency fund for unexpected costs.

3. Decision Fatigue:

  • Make design choices early to avoid stress during the remodel.

Tips for a Smooth Bathroom Remodel

  1. Set Realistic Expectations: Understand that the process can take several weeks.
  2. Stay Involved: Visit the site regularly and address concerns promptly.
  3. Focus on Functionality: Prioritize layouts and features that improve usability.
  4. Celebrate Your New Space: Enjoy the comfort and style of your upgraded bathroom.

Let HoneyB Construction Transform Your Bathroom

At HoneyB Construction, we specialize in custom bathroom remodels designed to fit your vision and lifestyle. From initial planning to the final walkthrough, our team ensures quality and satisfaction every step of the way.


Contact us today to start planning your bathroom remodel and create a space you’ll love for years to come!

Let HoneyB Construction Transform Your Bathroom